Guide to Shotcrete, (506R-16), 2016

Guide to Shotcrete, (506R-16), 2016

Guide to Shotcrete, (506R-16), 2016

Options
Regular price $129.99
/
  • Fast Delivery
  • Secure payments
  • In stock, ready to ship
  • Inventory on the way
Shipping calculated at checkout.

 


Guide to Shotcrete, (506R-16), 2016, This guide is a companion document to ACI 506.2, “Specification for Shotcrete,” and provides information on materials and properties of both dry-mix and wet-mix shotcrete. Most facets of the shotcrete process are covered, including application procedures, equipment requirements, and responsibilities of the shotcrete crew. Other aspects, such as preconstruction trials, craftsman qualification tests, materials tests, finished shotcrete acceptance tests, and equipment, are also discussed.

TABLE OF CONTENTS

PREFACE

Introduction

History

Applications

New developments

Research and development

PART 1—GENERAL

1.1—Scope

1.2—Definitions

1.3—References: See Part 7—References

1.4—Submittals

1.5—Preconstruction testing by contractor

1.6—Testing during construction: quality assurance and quality control

1.7—Delivery, storage, and handling

PART 2—PRODUCTS

2.1—Materials

2.2—Packaged shotcrete materials

2.3—Fiber-reinforced shotcrete

2.4—Shotcrete properties

2.5—Proportioning

2.6—Batching and mixing

PART 3—EXECUTION

3.1—Surface preparation

3.2—Joints

3.3—Alignment control

3.4—Application

3.5—Finishing

3.6—Curing

3.7—Protection

3.8—Tolerances

3.9—Repair

3.10—Acceptance

PART 4—EQUIPMENT

4.1—Introduction

4.2—Dry-mix equipment

4.3—Wet-mix equipment

4.4—Air requirements

4.5—Mixing equipment

4.6—Hoses

4.7—Nozzles

4.8—Auxiliary equipment

4.9—Plant layout and operation

4.10—Other uses of shotcrete equipment

PART 5—CREW ORGANIZATION

5.1—Introduction

5.2—Composition and crew duties

5.3—Crew qualifications

5.4—Communication

PART 6—SUSTAINABILITY

6.1—Shotcrete sustainability

6.2—Formwork reduction or elimination

6.3—Construction efficiency

6.4—Repair and rehabilitation

6.5—Creativity and efficiency of shotcrete sections

6.6—Summary

PART 7—REFERENCES

Authored references

All sales are final.

We are unable to issue a refund for your purchase. Please confirm the items that you require prior to making your purchase.

All items are non-returnable unless previously authorized and approved by a supervisor. A 20% restocking fee will be assessed on all returns that have been authorized and approved by a supervisor. 

Contact us to obtain a Return Authorization Number before sending any items back to us. We cannot accept a return without a Return Authorization Number. A copy of the itemized customer invoice listing the returned items must be enclosed with your return shipment. Shipping charges are non-reimbursable. We are unable to accept a credit card draft as a sales receipt.

All returns must be in salable condition.

We are unable to accept any returns on: 

  • All sale books
  • All directories
  • All codes and technical standards
  • All society/association documents
  • All study guides including EIT/FE/PE review texts and solution guides
  • Shrink wrapped items that have been opened
  • Software or books with disk packages that have been opened
  • Items that have been special ordered
  • PDF's
  • Online courses

We reserve the right to modify this Return Policy at our sole discretion, any such revision will be binding and effective immediately following the posting of the revised Return Policy on this website.

Delivery charges are calculated on a per-product basis. Please make note of the delivery charges associated with each item.

Orders are shipped Monday - Friday. We do not ship on Saturday, Sunday and Major Holidays.

We reserve the right to modify this Shipping Policy at our sole discretion, any such revision will be binding and effective immediately following the posting of the revised Shipping Policy on this website.

This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.

Recently viewed