2021 International Existing Building Code

2021 International Existing Building Code
Table of contents page from Print and Practice 12th Edition showing construction topics and page numbers
2021 International Existing Building Code
2021 International Existing Building Code
2021 International Existing Building Code
2021 International Existing Building Code

2021 International Existing Building Code

Book Options
Pratice Exam
Pre-printed Tabs
Regular price $130.00
/
  • Top Exam Success
  • Expert Exam Support
  • In stock. Fast Delivery
  • Inventory on the way
Shipping calculated at checkout.

2021 International Existing Building Code

You can purchase it new or professionally Highlighted & Tabbed for your exam. 

Encourages the use and reuse of existing buildings. This code covers repair, alteration, addition and change of occupancy for existing buildings. and historic buildings, while achieving appropriate levels of safety without requiring full compliance with the new construction requirements contained in the other I-Codes. Key changes in the 2021 IEBC® include:

  • For storm shelters, the required occupant capacity is now limited to the total occupant load of the classrooms, vocational rooms and offices in the school while the maximum distance of travel was deleted.
  • When significant portions of a building’s exterior wall coverings or exterior wall envelope are added or replaced, they must comply with the requirements of Chapters 14 and 26 of the IBC.
  • Snow loads must be addressed during repair of substantial structural damage regardless of whether the damage was a result of snow.
  • Additions, Level 3 alterations and Changes of occupancy in Educational occupancies are now required to meet the enhanced classroom acoustic requirements of Section 808 of ICC A117.1.
  • Additional equipment may be added to a roof without a full structural analysis when the equipment weighs less than 400 pounds and is less than 10 percent of the total roof dead load.
  • With a change of occupancy, a seismic analysis is required for a Group S or Group U occupancy changing to a new occupancy.
  • Furniture, such as office cubicles, reception desks or smaller bookcases, are exempt from a permit and not intended to be a Level 2 alteration.
  • Sprinkler requirements for Level 2 and Level 3 alterations are revised for higher hazard areas.

This book is offered in a Loose Leaf OR Softbound format.

You can purchase it new, or professionally Highlighted & Tabbed for your exam. 


Why Most Highlighted & Tabbed Books Fall Short?

Many contractor exam prep schools sell highlighted and tabbed books. Only one created the system—and perfected it through real-world use. That system was created by Rob Estell, a licensed contractor, President, and Founder. 

Open-book contractor exams don’t test how much you know. They test how quickly you can locate the correct answer inside dense reference manuals. Rob learned this firsthand by taking exams himself and later confirmed it through years of feedback from thousands of exam candidates.

While other schools offer highlighted and tabbed books, most:

  • Use minimal or generic highlights
  • Rely heavily on the existing Table of Contents and Index
  • Miss exam-tested material that isn’t clearly referenced
  • Provide tabs that point to broad sections, not precise answers

The result? Students still waste time searching.

Rob decided that “good enough” wasn’t good enough.


Why The Exam Pros ORIGINAL, detailed-driven highlighted and tabbed books? Thousands of contractors have passed their exams using Rob Estell’s highlighted and tabbed books because they solve the real problem:

  • Knowing the answer
  • But not being able to find it fast enough

Built from Contractor Experience & Student Feedback

Rob Estell’s system is built using:

  • His own experience as a licensed contractor
  • Personal exam feedback from real testing environments
  • Thousands of data points from exam students nationwide

A Proven, Detail-Oriented Navigation System

Each book follows Rob’s proven 3-step method:

  1. Table of Contents – Identify the general section
  2. Precision Tabs – Jump directly to the exact topic
  3. Strategic, Detailed Highlights – Land on the answer instantly

Our highlights are thorough and detail-oriented, guiding your eye exactly where exam answers are located—not just coloring pages for appearance.

  • Every highlight is intentional.
  • Every tab exists because the book failed to guide the reader quickly enough.
  • If a topic cannot be found efficiently through the Table of Contents or Index, it gets a custom tab and targeted highlight.

These books are designed to help you outperform the clock, not just prepare!

ISBN: 2021 International Existing Building Code PAPERBACK: 978-1-60983-969-7

ISBN: 2021 International Existing Building Code LOOSELEAF: 978-1-60983-970-3

 

 

    All sales are final.

    We are unable to issue a refund for your purchase. Please confirm the items that you require prior to making your purchase.

    All items are non-returnable unless previously authorized and approved by a supervisor. A 20% restocking fee will be assessed on all returns that have been authorized and approved by a supervisor. 

    Contact us to obtain a Return Authorization Number before sending any items back to us. We cannot accept a return without a Return Authorization Number. A copy of the itemized customer invoice listing the returned items must be enclosed with your return shipment. Shipping charges are non-reimbursable. We are unable to accept a credit card draft as a sales receipt.

    All returns must be in salable condition.

    We are unable to accept any returns on: 

    • All sale books
    • All directories
    • All codes and technical standards
    • All society/association documents
    • All study guides including EIT/FE/PE review texts and solution guides
    • Shrink wrapped items that have been opened
    • Software or books with disk packages that have been opened
    • Items that have been special ordered
    • PDF's
    • Online courses

    We reserve the right to modify this Return Policy at our sole discretion, any such revision will be binding and effective immediately following the posting of the revised Return Policy on this website.

    Delivery charges are calculated on a per-product basis. Please make note of the delivery charges associated with each item.

    Orders are shipped Monday - Friday. We do not ship on Saturday, Sunday and Major Holidays.

    We reserve the right to modify this Shipping Policy at our sole discretion, any such revision will be binding and effective immediately following the posting of the revised Shipping Policy on this website.

    This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.